← LotTruth · search another addressSign in

LotTruthby Colvos

26227 99th Ave SW, Vashon, WA 98070

Parcel 3022039104 · jurisdiction unknown · 0.88 acres · Single Family(Res Use/Zone) · built 1908

Get the full report

Plus: the full report on up to 10 lots a month, read online, cancel any time. Or 5 reports for $99. Plus sales tax.

Pay for 26227 99th Ave SW, Vashon, WA 98070

Card details go straight to Stripe; we never see them.

Basics

Parcel number
3022039104
Lot size (mapped outline)
0.88 acres (38,172 sq ft)
Land use
Single Family(Res Use/Zone)
Owner of record
WATERBURY BARBARA
Legal description
ShowE 400 FT OF PORTION OF GOVT LOT 2 IN NE QTR STR 30-22-03 LYING BETWEEN TWO LINES PARALLEL WITH & RESPECTIVELY 851.50 FT SOUTH AND 1053.05 FT SOUTH OF N LINE OF SAID GOVT LOT 2 EXC FOLLOWING DESCRIBED TRACT: BEGINNING AT NE CORNER OF SAID GOVT LOT 2 TH S00-43-33E ALONG E LINE OF SAID GOVT LOT 2 1053.05 FT MORE OR LESS TO S LINE OF N 1053.05 FT OF SAID GOVT LOT 2 & TPOB TH S89-16-59W PARALLEL WITH SAID N LINE OF GOVT LOT 2 DISTANCE OF 218.00 FT TH N09-24-06E 204.73 FT TO S LINE OF N851.50 FT OF GOVT LOT 2 TH N89-16-59E ALONG SAID LINE DISTANCE OF 182.00 FT TH S00-43-33E 201.56 FT TO TPOB (AKA "NEW LOT A" AS DESCRIBED & DELINEATED PER KING CO BOUNDARY LINE ADJUSTMENT NO L98L0122 RECORDING NO 19990701001595); EXC PORTION OF GOVT LOT 2 STR 30-22-03 LYING BETWEEN TWO LINES PARALLEL TO & RESPECTIVELY 851.50 & 1053.05 FT SOUTH OF N LINE OF SAID GOVT LOT 2 BEGINNING AT NE CORNER OF SAID GOVT LOT 2 TH S00-43-33E 1053.05 FT ALONG E LINE OF SAID GOVT LOT 2 TH S89-16-59W 393.69 & PARALLEL TO N LINE OF SAID GOVT LOT 2 FT TO TPOB TH S89-16-59W 6.31 FT TH N00-43-33W 201.55 FT TO POINT ON S LINE OF N 851.50 FT OF SAID GOVT LOT 2 TH N89-16-59E 21.15 FT TH S03-29-07W 202.09 FT TO TPOB
Last sale
2018-01-19 (price not on record for this lot)
Year built (assessor)
1908

Where it sits

In the full report

Nothing on the hazard maps for this lot. The report shows every check behind that.

See everything we found

See everything we found

How we got there

This report is built for this one lot by the LotTruth engine, our own geospatial engine.

Compiled from public records on 2026-11-21. Confirm anything you rely on with the office that issued the record.

Terms and notices